GATEWAY UPRGRADE NORTH

Client: LEND LEASE

Industry: DRAINAGE

Location: Nudgee QLD, Australia

Project Commencement: October, 2016

Project Completion: July, 2018


Project Highlights:

  • Installation of over 7 kilometres of Storm Water Pipe ranging from 375mm to 1500 diameter
  • Installation of over 200 pre cast and cast insuti pits, gullies and manholes
  • Open cut excavation crossing the M1 motorway installing storm water up to 3.5m deep undertaken during restricted hours night time closure, and ensuring all lanes were fully trafficable within allocated time frames.

Download Project PDF

Project Scope:

Widening the Gateway Motorway from four to six lanes from Nudgee to Deagon, Reconfiguring the Nudgee interchange, including a new Nudgee Road overpass and a relocated and extended northbound on-ramp. Widening of the Deagon Deviation between Depot Road and Bracken Ridge Road